Global Warming Images
 

 
IMG_7486_dive.jpg The RAF, REd Arrows flying over the Lake District during the Windermere Air Show, UK.
 
IMG_7486_dive
Add to Lightbox - Lightbox

 
IMG_7513_offset.jpg The RAF, REd Arrows flying over the Lake District during the Windermere Air Show, UK.
 
IMG_7513_offset
Add to Lightbox - Lightbox

 
IMG_7513_red.jpg The RAF, REd Arrows flying over the Lake District during the Windermere Air Show, UK.
 
IMG_7513_red
Add to Lightbox - Lightbox

 
IMG_7643_go back.jpg The RAF, REd Arrows flying over the Lake District during the Windermere Air Show, UK.
 
IMG_7643_go back
Add to Lightbox - Lightbox

 
IMG_7643_offset.jpg The RAF, REd Arrows flying over the Lake District during the Windermere Air Show, UK.
 
IMG_7643_offset
Add to Lightbox - Lightbox

 
IMG_1258_ladder.jpg Construction work on fitting two archimedes screws on a new hydro electric project on the River Leven, at Low Wood near Haverthwaite, Cumbria, UK. When operational they will generate over 400 Kw of green electricity. When operational they will be the largest archimedes screws in the UK. The project uses the old mill race that used to power the gunpowder factory. Heat generated by the turbines, that is usually lost to the atmosphere is going to be pumped directly into a nearby office building. At times when the hydro is not working the offices will be heated by 4 air source heat pumps.
 
IMG_1258_ladder
Add to Lightbox - Lightbox

 
IMG_1263_ladder climb.jpg Construction work on fitting two archimedes screws on a new hydro electric project on the River Leven, at Low Wood near Haverthwaite, Cumbria, UK. When operational they will generate over 400 Kw of green electricity. When operational they will be the largest archimedes screws in the UK. The project uses the old mill race that used to power the gunpowder factory. Heat generated by the turbines, that is usually lost to the atmosphere is going to be pumped directly into a nearby office building. At times when the hydro is not working the offices will be heated by 4 air source heat pumps.
 
IMG_1263_ladder climb
Add to Lightbox - Lightbox

 
IMG_8367_dam.jpg Karahnjukar dam and Halslon reservoir, a massive new contorversial hydro electricity project in North East Iceland, in the wilderness area of Vatnajokull, created by damming the Jokuls a Dal river. Controversial as it flooded a huge area of one of Europes last wilderness areas, that was home to nesting Whooper Swans and Pink Footed Geese. The project does however produce 40% of Icelands electricity from renewables. The projects statistics are as follows, power generation, 700MW, gross head, 600 metres, Max flow 144 M/sec, Halslon Lake area 57KM squared, storage volume 2.1 million metres, damheight 198m (the tallest in Europe) headrace tunnels 73km. 100 % of Icelands electricity is generated from renewables, 70% from hydro and 30% from geothermal. This shot shows a climber above the dam
 
IMG_8367_dam
Add to Lightbox - Lightbox

 
IMG_8370_climber.jpg Karahnjukar dam and Halslon reservoir, a massive new contorversial hydro electricity project in North East Iceland, in the wilderness area of Vatnajokull, created by damming the Jokuls a Dal river. Controversial as it flooded a huge area of one of Europes last wilderness areas, that was home to nesting Whooper Swans and Pink Footed Geese. The project does however produce 40% of Icelands electricity from renewables. The projects statistics are as follows, power generation, 700MW, gross head, 600 metres, Max flow 144 M/sec, Halslon Lake area 57KM squared, storage volume 2.1 million metres, damheight 198m (the tallest in Europe) headrace tunnels 73km. 100 % of Icelands electricity is generated from renewables, 70% from hydro and 30% from geothermal. This shot shows a climber above the dam
 
IMG_8370_climber
Add to Lightbox - Lightbox

 
IMG_1830_yellow.jpg The Krakken, a jack up barge, that is constructing the wind turbines of the Walney offshore wind farm. The farm consists of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. Cumbria, UK.
 
IMG_1830_yellow
Add to Lightbox - Lightbox

 
IMG_1836_working at height.jpg The Krakken, a jack up barge, that is constructing the wind turbines of the Walney offshore wind farm. The farm consists of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. Cumbria, UK.
 
IMG_1836_working at height
Add to Lightbox - Lightbox

 
IMG_1844_ladder.jpg The Krakken, a jack up barge, that is constructing the wind turbines of the Walney offshore wind farm. The farm consists of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. Cumbria, UK.
 
IMG_1844_ladder
Add to Lightbox - Lightbox

 
IMG_1860_ladder climb.jpg The Krakken, a jack up barge, that is constructing the wind turbines of the Walney offshore wind farm. The farm consists of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. Cumbria, UK.
 
IMG_1860_ladder climb
Add to Lightbox - Lightbox

 
IMG_1375_step ladder.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows a nacelle being prepared to lift.
 
IMG_1375_step ladder
Add to Lightbox - Lightbox

 
IMG_1381_stepladder.jpg Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows a nacelle being prepared to lift.
 
IMG_1381_stepladder
Add to Lightbox - Lightbox

 
IMG_9086_yellow.jpg An engineer climbs a transition piece of a wind turbine on the Walney offshore wind farm, which consists of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. Cumbria, UK.
 
IMG_9086_yellow
Add to Lightbox - Lightbox

 
IMG_9088_man.jpg An engineer climbs a transition piece of a wind turbine on the Walney offshore wind farm, which consists of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. Cumbria, UK.
 
IMG_9088_man
Add to Lightbox - Lightbox

 
IMG_9090_yellow.jpg An engineer climbs a transition piece of a wind turbine on the Walney offshore wind farm, which consists of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. Cumbria, UK.
 
IMG_9090_yellow
Add to Lightbox - Lightbox

 
IMG_9091_fall arrester.jpg An engineer climbs a transition piece of a wind turbine on the Walney offshore wind farm, which consists of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. Cumbria, UK.
 
IMG_9091_fall arrester
Add to Lightbox - Lightbox

 
IMG_9096_ladder.jpg An engineer climbs a transition piece of a wind turbine on the Walney offshore wind farm, which consists of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. Cumbria, UK.
 
IMG_9096_ladder
Add to Lightbox - Lightbox

 
IMG_9100_climb.jpg An engineer climbs a transition piece of a wind turbine on the Walney offshore wind farm, which consists of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. Cumbria, UK.
 
IMG_9100_climb
Add to Lightbox - Lightbox

 
IMG_9118_nacelle.jpg An engineer on a transition piece of a wind turbine on the Walney offshore wind farm, which consists of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. Cumbria, UK.
 
IMG_9118_nacelle
Add to Lightbox - Lightbox

 
IMG_9122_rotor.jpg An engineer on a transition piece of a wind turbine on the Walney offshore wind farm, which consists of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. Cumbria, UK.
 
IMG_9122_rotor
Add to Lightbox - Lightbox

 
IMG_9195_rung.jpg An engineer climbs a transition piece of a wind turbine on the Walney offshore wind farm, which consists of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. Cumbria, UK.
 
IMG_9195_rung
Add to Lightbox - Lightbox

 
IMG_9196_height.jpg An engineer climbs a transition piece of a wind turbine on the Walney offshore wind farm, which consists of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. Cumbria, UK.
 
IMG_9196_height
Add to Lightbox - Lightbox

 
IMG_9197_drop.jpg An engineer climbs a transition piece of a wind turbine on the Walney offshore wind farm, which consists of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. Cumbria, UK.
 
IMG_9197_drop
Add to Lightbox - Lightbox

 
IMG_9198_working at height.jpg An engineer climbs a transition piece of a wind turbine on the Walney offshore wind farm, which consists of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. Cumbria, UK.
 
IMG_9198_working at height
Add to Lightbox - Lightbox

 
IMG_9199_ladder climb.jpg An engineer climbs a transition piece of a wind turbine on the Walney offshore wind farm, which consists of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. Cumbria, UK.
 
IMG_9199_ladder climb
Add to Lightbox - Lightbox

 
IMG_9242_platform.jpg An engineer descends a transition piece of a wind turbine on the Walney offshore wind farm, towards the deck of a crew transfer vessel. The wind farm consists of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. Cumbria, UK.
 
IMG_9242_platform
Add to Lightbox - Lightbox

 
IMG_9246_ppe.jpg An engineer descends a transition piece of a wind turbine on the Walney offshore wind farm, towards the deck of a crew transfer vessel. The wind farm consists of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. Cumbria, UK.
 
IMG_9246_ppe
Add to Lightbox - Lightbox

 
IMG_9250_ascend.jpg An engineer descends a transition piece of a wind turbine on the Walney offshore wind farm, towards the deck of a crew transfer vessel. The wind farm consists of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. Cumbria, UK.
 
IMG_9250_ascend
Add to Lightbox - Lightbox

 
IMG_9252_rung.jpg An engineer descends a transition piece of a wind turbine on the Walney offshore wind farm, towards the deck of a crew transfer vessel. The wind farm consists of 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. Cumbria, UK.
 
IMG_9252_rung
Add to Lightbox - Lightbox

Media Per Page