Global Warming Images
 

 
366W3079_bio.jpg Oilseed rape growing in a field in Cheshire UK. The rush to grow crops for biofuels is pushing up food prices and in some cases is just as carbon intensive as the oil based fuels it replaces.
 
366W3079_bio
Add to Lightbox - Lightbox

 
366W3089_biofuel.jpg Oilseed rape growing in a field in Cheshire UK. The rush to grow crops for biofuels is pushing up food prices and in some cases is just as carbon intensive as the oil based fuels it replaces.
 
366W3089_biofuel
Add to Lightbox - Lightbox

 
366W3091_bio.jpg Oilseed rape growing in a field in Cheshire UK. The rush to grow crops for biofuels is pushing up food prices and in some cases is just as carbon intensive as the oil based fuels it replaces.
 
366W3091_bio
Add to Lightbox - Lightbox

 
366W3413_bio.jpg The irony of Ratcliffe on Soar a massive coal powered power station in Nottinghamshire UK that is responsible for huge carbon dioxide emmissions surrounded by rape grown to make biodiesel
 
366W3413_bio
Add to Lightbox - Lightbox

 
IMG_9674_bio.jpg Oil Seed Rape growing on farmland near Scotch Corner, Yorkshire, UK. Such crops are being increasingly grown for biofuel.
 
IMG_9674_bio
Add to Lightbox - Lightbox

 
IMG_9675_bio.jpg Oil Seed Rape growing on farmland near Scotch Corner, Yorkshire, UK. Such crops are being increasingly grown for biofuel. In the background is a farm shop selling home grown and reared produce.
 
IMG_9675_bio
Add to Lightbox - Lightbox

 
IMG_9679_bio.jpg Oil Seed Rape growing on farmland near Scotch Corner, Yorkshire, UK. Such crops are being increasingly grown for biofuel. In the background is a farm shop selling home grown and reared produce.
 
IMG_9679_bio
Add to Lightbox - Lightbox

 
IMG_9699_bio.jpg Oil Seed Rape growing on farmland near Scotch Corner, Yorkshire, UK. Such crops are being increasingly grown for biofuel.
 
IMG_9699_bio
Add to Lightbox - Lightbox

 
IMG_1438_heat pump.jpg The old Clock Tower Builing at Low Wood near Haverthawaite, Cumbria, UK, has been given a complete make over. It has been renovated to provide office accomodation on a very green scael. Next to the building, 2 huge archimedes screws provide hydro electricity for the building and the grid. Excess heat from the turbines which would be normally lost to the atmosphere is being pumped into the buildings. Also air source heat pumps are used to heat the building, which are shown in this image.
 
IMG_1438_heat pump
Add to Lightbox - Lightbox

 
IMG_1439_heat pump.jpg The old Clock Tower Builing at Low Wood near Haverthawaite, Cumbria, UK, has been given a complete make over. It has been renovated to provide office accomodation on a very green scael. Next to the building, 2 huge archimedes screws provide hydro electricity for the building and the grid. Excess heat from the turbines which would be normally lost to the atmosphere is being pumped into the buildings. Also air source heat pumps are used to heat the building, which are shown in this image.
 
IMG_1439_heat pump
Add to Lightbox - Lightbox

 
IMG_1442_insulated.jpg The old Clock Tower Builing at Low Wood near Haverthawaite, Cumbria, UK, has been given a complete make over. It has been renovated to provide office accomodation on a very green scael. Next to the building, 2 huge archimedes screws provide hydro electricity for the building and the grid. Excess heat from the turbines which would be normally lost to the atmosphere is being pumped into the buildings. Also air source heat pumps are used to heat the building, which are shown in this image.
 
IMG_1442_insulated
Add to Lightbox - Lightbox

 
IMG_1444_tank.jpg The old Clock Tower Builing at Low Wood near Haverthawaite, Cumbria, UK, has been given a complete make over. It has been renovated to provide office accomodation on a very green scael. Next to the building, 2 huge archimedes screws provide hydro electricity for the building and the grid. Excess heat from the turbines which would be normally lost to the atmosphere is being pumped into the buildings. Also air source heat pumps are used to heat the building, which are shown in this image.
 
IMG_1444_tank
Add to Lightbox - Lightbox

 
IMG_1449_technology.jpg The old Clock Tower Builing at Low Wood near Haverthawaite, Cumbria, UK, has been given a complete make over. It has been renovated to provide office accomodation on a very green scael. Next to the building, 2 huge archimedes screws provide hydro electricity for the building and the grid. Excess heat from the turbines which would be normally lost to the atmosphere is being pumped into the buildings. Also air source heat pumps are used to heat the building, which are shown in this image.
 
IMG_1449_technology
Add to Lightbox - Lightbox

 
IMG_1452_air source.jpg The old Clock Tower Builing at Low Wood near Haverthawaite, Cumbria, UK, has been given a complete make over. It has been renovated to provide office accomodation on a very green scael. Next to the building, 2 huge archimedes screws provide hydro electricity for the building and the grid. Excess heat from the turbines which would be normally lost to the atmosphere is being pumped into the buildings. Also air source heat pumps are used to heat the building, which are shown in this image.
 
IMG_1452_air source
Add to Lightbox - Lightbox

 
IMG_1453_heat pump.jpg The old Clock Tower Builing at Low Wood near Haverthawaite, Cumbria, UK, has been given a complete make over. It has been renovated to provide office accomodation on a very green scael. Next to the building, 2 huge archimedes screws provide hydro electricity for the building and the grid. Excess heat from the turbines which would be normally lost to the atmosphere is being pumped into the buildings. Also air source heat pumps are used to heat the building, which are shown in this image.
 
IMG_1453_heat pump
Add to Lightbox - Lightbox

 
IMG_1455_air source heat pump.jpg The old Clock Tower Builing at Low Wood near Haverthawaite, Cumbria, UK, has been given a complete make over. It has been renovated to provide office accomodation on a very green scael. Next to the building, 2 huge archimedes screws provide hydro electricity for the building and the grid. Excess heat from the turbines which would be normally lost to the atmosphere is being pumped into the buildings. Also air source heat pumps are used to heat the building, which are shown in this image.
 
IMG_1455_air source heat pump
Add to Lightbox - Lightbox

 
IMG_1433_clock tower.jpg The old Clock Tower Builing at Low Wood near Haverthawaite, Cumbria, UK, has been given a complete make over. It has been renovated to provide office accomodation on a very green scael. Next to the building, 2 huge archimedes screws provide hydro electricity for the building and the grid. Excess heat from the turbines which would be normally lost to the atmosphere is being pumped into the buildings. Also air source heat pumps are used to heat the building.
 
IMG_1433_clock tower
Add to Lightbox - Lightbox

 
IMG_1435_air source heat pump.jpg The old Clock Tower Builing at Low Wood near Haverthawaite, Cumbria, UK, has been given a complete make over. It has been renovated to provide office accomodation on a very green scael. Next to the building, 2 huge archimedes screws provide hydro electricity for the building and the grid. Excess heat from the turbines which would be normally lost to the atmosphere is being pumped into the buildings. Also air source heat pumps are used to heat the building, qwhich are housed in the wooden shed in the foreground.
 
IMG_1435_air source heat pump
Add to Lightbox - Lightbox

 
IMG_1008_ladder.jpg Construction work on fitting two archimedes screws on a new hydro electric project on the River Leven, at Low Wood near Haverthwaite, Cumbria, UK. When operational they will generate over 400 Kw of green electricity. The project uses the old mill race that used to power the gunpowder factory. Heat generated by the turbines, that is usually lost to the atmosphere is going to be pumped directly into a nearby office building. At times when the hydro is not working theoffices will be heated by 4 air source heat pumps.
 
IMG_1008_ladder
Add to Lightbox - Lightbox

 
IMG_1009_concrete.jpg Construction work on fitting two archimedes screws on a new hydro electric project on the River Leven, at Low Wood near Haverthwaite, Cumbria, UK. When operational they will generate over 400 Kw of green electricity. The project uses the old mill race that used to power the gunpowder factory. Heat generated by the turbines, that is usually lost to the atmosphere is going to be pumped directly into a nearby office building. At times when the hydro is not working theoffices will be heated by 4 air source heat pumps.
 
IMG_1009_concrete
Add to Lightbox - Lightbox

 
IMG_1017_intake.jpg Construction work on fitting two archimedes screws on a new hydro electric project on the River Leven, at Low Wood near Haverthwaite, Cumbria, UK. When operational they will generate over 400 Kw of green electricity. The project uses the old mill race that used to power the gunpowder factory. Heat generated by the turbines, that is usually lost to the atmosphere is going to be pumped directly into a nearby office building. At times when the hydro is not working theoffices will be heated by 4 air source heat pumps.
 
IMG_1017_intake
Add to Lightbox - Lightbox

 
IMG_1021_intake.jpg Construction work on fitting two archimedes screws on a new hydro electric project on the River Leven, at Low Wood near Haverthwaite, Cumbria, UK. When operational they will generate over 400 Kw of green electricity. The project uses the old mill race that used to power the gunpowder factory. Heat generated by the turbines, that is usually lost to the atmosphere is going to be pumped directly into a nearby office building. At times when the hydro is not working theoffices will be heated by 4 air source heat pumps.
 
IMG_1021_intake
Add to Lightbox - Lightbox

 
IMG_1024_lake district.jpg Construction work on fitting two archimedes screws on a new hydro electric project on the River Leven, at Low Wood near Haverthwaite, Cumbria, UK. When operational they will generate over 400 Kw of green electricity. The project uses the old mill race that used to power the gunpowder factory. Heat generated by the turbines, that is usually lost to the atmosphere is going to be pumped directly into a nearby office building. At times when the hydro is not working theoffices will be heated by 4 air source heat pumps.
 
IMG_1024_lake district
Add to Lightbox - Lightbox

 
IMG_1025_hep.jpg Construction work on fitting two archimedes screws on a new hydro electric project on the River Leven, at Low Wood near Haverthwaite, Cumbria, UK. When operational they will generate over 400 Kw of green electricity. The project uses the old mill race that used to power the gunpowder factory. Heat generated by the turbines, that is usually lost to the atmosphere is going to be pumped directly into a nearby office building. At times when the hydro is not working theoffices will be heated by 4 air source heat pumps.
 
IMG_1025_hep
Add to Lightbox - Lightbox

 
IMG_1029_HEP.jpg Construction work on fitting two archimedes screws on a new hydro electric project on the River Leven, at Low Wood near Haverthwaite, Cumbria, UK. When operational they will generate over 400 Kw of green electricity. The project uses the old mill race that used to power the gunpowder factory. Heat generated by the turbines, that is usually lost to the atmosphere is going to be pumped directly into a nearby office building. At times when the hydro is not working theoffices will be heated by 4 air source heat pumps.
 
IMG_1029_HEP
Add to Lightbox - Lightbox

 
IMG_1034_electric.jpg Construction work on fitting two archimedes screws on a new hydro electric project on the River Leven, at Low Wood near Haverthwaite, Cumbria, UK. When operational they will generate over 400 Kw of green electricity. The project uses the old mill race that used to power the gunpowder factory. Heat generated by the turbines, that is usually lost to the atmosphere is going to be pumped directly into a nearby office building. At times when the hydro is not working theoffices will be heated by 4 air source heat pumps.
 
IMG_1034_electric
Add to Lightbox - Lightbox

 
IMG_1037_blue.jpg Construction work on fitting two archimedes screws on a new hydro electric project on the River Leven, at Low Wood near Haverthwaite, Cumbria, UK. When operational they will generate over 400 Kw of green electricity. The project uses the old mill race that used to power the gunpowder factory. Heat generated by the turbines, that is usually lost to the atmosphere is going to be pumped directly into a nearby office building. At times when the hydro is not working theoffices will be heated by 4 air source heat pumps.
 
IMG_1037_blue
Add to Lightbox - Lightbox

 
IMG_1039_angle.jpg Construction work on fitting two archimedes screws on a new hydro electric project on the River Leven, at Low Wood near Haverthwaite, Cumbria, UK. When operational they will generate over 400 Kw of green electricity. The project uses the old mill race that used to power the gunpowder factory. Heat generated by the turbines, that is usually lost to the atmosphere is going to be pumped directly into a nearby office building. At times when the hydro is not working theoffices will be heated by 4 air source heat pumps.
 
IMG_1039_angle
Add to Lightbox - Lightbox

 
IMG_1041_mill race.jpg Construction work on fitting two archimedes screws on a new hydro electric project on the River Leven, at Low Wood near Haverthwaite, Cumbria, UK. When operational they will generate over 400 Kw of green electricity. The project uses the old mill race that used to power the gunpowder factory. Heat generated by the turbines, that is usually lost to the atmosphere is going to be pumped directly into a nearby office building. At times when the hydro is not working theoffices will be heated by 4 air source heat pumps.
 
IMG_1041_mill race
Add to Lightbox - Lightbox

 
IMG_1230_mill race.jpg Construction work on fitting two archimedes screws on a new hydro electric project on the River Leven, at Low Wood near Haverthwaite, Cumbria, UK. When operational they will generate over 400 Kw of green electricity. When operational they will be the largest archimedes screws in the UK. The project uses the old mill race that used to power the gunpowder factory. Heat generated by the turbines, that is usually lost to the atmosphere is going to be pumped directly into a nearby office building. At times when the hydro is not working the offices will be heated by 4 air source heat pumps.
 
IMG_1230_mill race
Add to Lightbox - Lightbox

 
IMG_1237_working.jpg Construction work on fitting two archimedes screws on a new hydro electric project on the River Leven, at Low Wood near Haverthwaite, Cumbria, UK. When operational they will generate over 400 Kw of green electricity. When operational they will be the largest archimedes screws in the UK. The project uses the old mill race that used to power the gunpowder factory. Heat generated by the turbines, that is usually lost to the atmosphere is going to be pumped directly into a nearby office building. At times when the hydro is not working the offices will be heated by 4 air source heat pumps.
 
IMG_1237_working
Add to Lightbox - Lightbox

 
IMG_1241_netting.jpg Construction work on fitting two archimedes screws on a new hydro electric project on the River Leven, at Low Wood near Haverthwaite, Cumbria, UK. When operational they will generate over 400 Kw of green electricity. When operational they will be the largest archimedes screws in the UK. The project uses the old mill race that used to power the gunpowder factory. Heat generated by the turbines, that is usually lost to the atmosphere is going to be pumped directly into a nearby office building. At times when the hydro is not working the offices will be heated by 4 air source heat pumps.
 
IMG_1241_netting
Add to Lightbox - Lightbox

Media Per Page