Image No: IMG_9182_footbridge |
|
|
 |
|
Downloadable sizes |
Format |
| Web use only - 1MB* |
RGB |
| A5** - 10MB |
RGB |
| A4** - 25MB |
RGB |
*Images sizes are approximate
and give a guide to size only.
**Print size is approximate and
indicative only. No guarantee is given for exact sizes.
Please contact us for larger sizes
and further information.
Download Preview
To download the image shown right click (mac, ctrl+click) on the image. Select
the Save Image As... option from the menu that appears. Choose
the destination where you wish to save the image.
|
The devastating floods that hit Cumbria divided the town of Workington in half after all the bridges crossing the river Derwent that seperates the town were destroyed. This left many residents with a 40 mile car journey to get to work or school, which previously had been a half mile walk. This week a footbridge was installed by the army to reconnect the two halves of the town. The bridge was named the Barker Crossing after PC Bill Barker who lost his life when Workingtons main road bridge was destroyed. There is still no way across for vehicles and Cumbria County councul announced this week that it could take up to two years to erect a new road bridge.
weather
extreme weather
environment
rain
rainfall
exceptional
global warming
deluge
climate change
Cumbria
Lake District
flood
flooding
flood damage
destruction
water
water power
river
flood damage
polluted
contaminated
flood water
bridge
cxollapse
destroyed
destruction
bridge collapse
washed away
Workinton
River Derwent
infrastructure
Northside Bridge
policeman
death
PC Bill Barker
army
Barker Crossing
engineer
|
|
Send to Friend
- Lightbox
|
| |
|
|
|
|